Quick answer
Static Equipment Design covers delivering design and analysis for the full range of static process equipment. Done properly, it follows ASME Sec VIII Div 1/2, EN 13445, PD 5500 and produces mechanical design calculations that a fabricator or reviewer can use without rework. Structural Engineering Services delivers static equipment design to clients in 40+ countries with a senior-engineer review on every package.
What static equipment design actually includes
Static Equipment Design is the discipline of delivering design and analysis for the full range of static process equipment. In practice a complete scope covers the full chain from design inputs to construction-ready output, not just a single drawing or calculation.
A typical static equipment design package from our team includes: mechanical design calculations, general arrangement drawing, fabrication & detail drawings, nozzle load & local stress checks. Each deliverable is produced on licensed PV-Elite, Codeware COMPRESS, Autodesk Inventor and passes an internal checker review before it reaches you.
How the work is delivered, step by step
Most engagements follow the same five-stage flow, whether the package is a single drawing or a multi-month frame agreement.
- Share inputs — design drawings, specifications and the project schedule.
- Free quote in 24 hours — fixed lump-sum, per-tonne, per-drawing or hourly.
- Model & engineer — built on PV-Elite to ASME Sec VIII Div 1/2.
- Review & approve — internal check, then your comments closed fast.
- Issue for construction — mechanical design calculations and general arrangement drawing issued with revision control.
Which codes and standards govern static equipment design
The governing standard depends on where your project is built. Our teams work daily to ASME Sec VIII Div 1/2, EN 13445, PD 5500, API 650, TEMA, API 660 and to client specifications such as Shell DEPs and major operator standards.
Getting the code basis agreed at kick-off is the single most effective way to avoid late-stage rework — it fixes load combinations, material grades, tolerances and documentation format before modeling starts.
When you need it — and when you don't
You need professional static equipment design whenever the output feeds fabrication, regulatory review or a design-responsibility handover. Early concept sketches and feasibility studies can be lighter, but anything issued for construction should carry a checked, code-referenced package.
If you are unsure which level of detail your project needs, send us your inputs — a senior engineer will scope it honestly, even if that means telling you a smaller package will do.

What Is Static Equipment Design? A Complete Guide: FAQ
What is static equipment design?
Static Equipment Design covers delivering design and analysis for the full range of static process equipment. Done properly, it follows ASME Sec VIII Div 1/2, EN 13445, PD 5500 and produces mechanical design calculations that a fabricator or reviewer can use without rework. Structural Engineering Services delivers static equipment design to clients in 40+ countries with a senior-engineer review on every package.
Which software is used for static equipment design?
We deliver on licensed PV-Elite, Codeware COMPRESS, Autodesk Inventor and issue native files plus PDF, DWG and IFC on request.
Which standards do you follow for static equipment design?
We work to ASME Sec VIII Div 1/2, EN 13445, PD 5500, API 650, TEMA, API 660, plus client specifications such as Shell DEPs and major operator standards.
How long does a static equipment design package take?
Small packages are typically delivered in 3–7 working days; larger scopes are split into phased submissions agreed at kick-off.
How do I get a quote for static equipment design?
Send your drawings or scope through our quote form — a senior engineer reviews them and returns a fixed-price proposal within 24 hours, free and without obligation.
