Complete Guides · Industrial Building Design

What Is Industrial Building Design? A Complete Guide

Buyers of industrial building design tend to ask the same questions: what is actually included, what does it cost, which standards apply and how do you pick a reliable partner? This article answers all four with the level of detail your project team needs.

Key takeaways3 min read4 sections

The short version

  1. 1What industrial building design actually includesIndustrial Building Design is the discipline of engineering heavy industrial buildings with crane girders, mezzanines and equipment loads.
  2. 2How the work is delivered, step by stepMost engagements follow the same five-stage flow, whether the package is a single drawing or a multi-month frame agreement.
  3. 3Which codes and standards govern industrial building designThe governing standard depends on where your project is built.
  4. 4When you need it — and when you don'tYou need professional industrial building design whenever the output feeds fabrication, regulatory review or a design-responsibility handover.
  5. 5The bottom lineAgree the deliverable list, the code basis and the review gate before modelling starts — that one conversation prevents most industrial building design rework.

Quick answer

In short, industrial building design means engineering heavy industrial buildings with crane girders, mezzanines and equipment loads. The work is governed by AISC 360 and EN 1993, executed on licensed Tekla Structures and checked against a documented QA checklist before issue.

What industrial building design actually includes

Industrial Building Design is the discipline of engineering heavy industrial buildings with crane girders, mezzanines and equipment loads. In practice a complete scope covers the full chain from design inputs to construction-ready output, not just a single drawing or calculation.

A typical industrial building design package from our team includes: lod 400 tekla 3d model, single-part & assembly shop drawings, erection & ga drawings, bolt lists, nc/dstv & dxf files. Each deliverable is produced on licensed Tekla Structures, AutoCAD, Navisworks and passes an internal checker review before it reaches you.

How the work is delivered, step by step

Most engagements follow the same five-stage flow, whether the package is a single drawing or a multi-month frame agreement.

  • Share inputs — design drawings, specifications and the project schedule.
  • Free quote in 24 hours — fixed lump-sum, per-tonne, per-drawing or hourly.
  • Model & engineer — built on Tekla Structures to AISC 360.
  • Review & approve — internal check, then your comments closed fast.
  • Issue for construction — lod 400 tekla 3d model and single-part & assembly shop drawings issued with revision control.

Which codes and standards govern industrial building design

The governing standard depends on where your project is built. Our teams work daily to AISC 360, EN 1993, IS 800, AWS D1.1 and to client specifications such as Shell DEPs and major operator standards.

Getting the code basis agreed at kick-off is the single most effective way to avoid late-stage rework — it fixes load combinations, material grades, tolerances and documentation format before modeling starts.

When you need it — and when you don't

You need professional industrial building design whenever the output feeds fabrication, regulatory review or a design-responsibility handover. Early concept sketches and feasibility studies can be lighter, but anything issued for construction should carry a checked, code-referenced package.

If you are unsure which level of detail your project needs, send us your inputs — a senior engineer will scope it honestly, even if that means telling you a smaller package will do.

Industrial Building Design — complete guides

What Is Industrial Building Design? A Complete Guide: FAQ

What is industrial building design?

In short, industrial building design means engineering heavy industrial buildings with crane girders, mezzanines and equipment loads. The work is governed by AISC 360 and EN 1993, executed on licensed Tekla Structures and checked against a documented QA checklist before issue.

Which software is used for industrial building design?

We deliver on licensed Tekla Structures, AutoCAD, Navisworks and issue native files plus PDF, DWG and IFC on request.

Which standards do you follow for industrial building design?

We work to AISC 360, EN 1993, IS 800, AWS D1.1, plus client specifications such as Shell DEPs and major operator standards.

How long does a industrial building design package take?

Small packages are typically delivered in 3–7 working days; larger scopes are split into phased submissions agreed at kick-off.

How do I get a quote for industrial building design?

Send your drawings or scope through our quote form — a senior engineer reviews them and returns a fixed-price proposal within 24 hours, free and without obligation.

How it runs

A industrial building design package, stage by stage

Most engagements follow the same five stages, whether the scope is one drawing or a multi-year frame agreement. Durations below are typical for a small-to-medium package.

Phased submissions let fabrication start on the first release while later stages are still in production — agree the split at kick-off.

  1. 01

    Inputs & kick-off

    Day 0–1

    Design drawings, specifications and the schedule are logged in a document register. The code basis (AISC 360) and the deliverable list are agreed in writing.

  2. 02

    Fixed-price proposal

    Within 24 hours

    A senior engineer scopes the work and returns a lump-sum, per-unit or rate-based proposal with the inclusions stated line by line.

  3. 03

    Model & engineer

    Days 2–10

    The work is built on licensed Tekla Structures to AISC 360, with interim progress models shared so misunderstandings surface early rather than at issue.

  4. 04

    Check & client review

    Days 8–12

    An independent checker reviews the package against the compliance matrix, then your comments are closed and recorded against the lod 400 tekla 3d model.

  5. 05

    Issue for construction

    Days 12–15

    Lod 400 tekla 3d model and single-part & assembly shop drawings are transmitted under formal revision control, with native files and the checker's record attached.

Work through this

The industrial building design checklist

Fifteen points, in the order you will need them — from assembling the enquiry to signing off the final transmittal. Tick them here, or copy them into your own project procedure.

15 checks
01

Before you send the enquiry

Everything a supplier needs in order to price accurately.

02

Scoping the package

Decide how much engineering you are actually buying.

03

Before you accept the package

Fifteen minutes here saves a fabrication hold.

About this guide

How we know this

Written from delivered work
The guidance here comes from live industrial building design packages produced on licensed Tekla Structures, AutoCAD, Navisworks — not from a content brief.
Checked against the governing codes
Every technical statement is cross-read against AISC 360, EN 1993, IS 800, AWS D1.1 and the operator specifications our teams work to daily.
Reviewed through the same checker gate
A senior engineer who signs off industrial building design deliverables reviewed this article, using the independent-check process every client package passes through.
Revised when the standards move
Articles are re-read and re-stamped whenever a governing code edition, software release or client specification changes materially.

2009

Engineering since

1,200+

Projects delivered

40+

Countries served

60+

In-house engineers

Reviewed by

Steel Structures & Detailing practice

Senior engineer, SES steel structures & detailing team

Last reviewed
2 June 2026
Review gate
Independent checker

Working toolset

Tekla StructuresAutoCADNavisworks

Next step

Ready to put this into practice on industrial building design?

See the full service scope, or send drawings and get a fixed price from a senior engineer in 24 hours.

Read next: Industrial Building Design Cost: Pricing, Rates & How to Budget