Quick answer
In short, lifting & rigging calculations means calculating lifting lug, spreader and package lifting loads for safe installation. The work is governed by AISC 360 and ASCE 7, executed on licensed STAAD.Pro and checked against a documented QA checklist before issue.
The 7 mistakes that cause most lifting & rigging calculations rework
After reviewing hundreds of incoming lifting & rigging calculations packages, the same seven failures account for the overwhelming majority of rework. Each is listed with the fix we apply on our own projects.
- No agreed design basis — fix: a signed basis-of-design before modeling starts.
- Wrong code edition — fix: the compliance matrix names the edition, not just the code.
- Skipping the independent check — fix: every package passes a checker who did not build it.
- Poor input control — fix: a single register of received documents and revisions.
- Ambiguous revision control — fix: formal transmittals so the current issue is never in doubt.
- Underestimating client specifications — fix: operator standards mapped at kick-off, not discovered at review.
- No constructability review — fix: a fabricator's-eye pass before issue for construction.
A QA checklist you can reuse
Whether you use us or another supplier, hold your lifting & rigging calculations package to this acceptance checklist before you pay the final invoice:
- Analysis model & load combinations — present, complete and revision-controlled.
- Design calculation report — present, complete and revision-controlled.
- Connection design sheets — present, complete and revision-controlled.
- Foundation load & design report — present, complete and revision-controlled.
- Code references (AISC 360) shown on every calculation and drawing.
- Checker's review record included in the transmittal.
What good looks like
A well-run lifting & rigging calculations engagement is quiet: few RFIs, no surprise change orders and output that your fabricator or reviewer accepts without a comments spiral. That outcome is designed in at kick-off — through the design basis, the compliance matrix and the review gates — not rescued at the end.

7 Common Lifting & Rigging Calculations Mistakes (and How to Avoid Them): FAQ
What are the most common lifting & rigging calculations mistakes?
In short, lifting & rigging calculations means calculating lifting lug, spreader and package lifting loads for safe installation. The work is governed by AISC 360 and ASCE 7, executed on licensed STAAD.Pro and checked against a documented QA checklist before issue.
Which software is used for lifting & rigging calculations?
We deliver on licensed STAAD.Pro, RAM Connection, Foundation Advanced and issue native files plus PDF, DWG and IFC on request.
Which standards do you follow for lifting & rigging calculations?
We work to AISC 360, ASCE 7, EN 1993, IS 800, ACI 318, plus client specifications such as Shell DEPs and major operator standards.
How long does a lifting & rigging calculations package take?
Small packages are typically delivered in 3–7 working days; larger scopes are split into phased submissions agreed at kick-off.
How do I get a quote for lifting & rigging calculations?
Send your drawings or scope through our quote form — a senior engineer reviews them and returns a fixed-price proposal within 24 hours, free and without obligation.