Quick answer
In short, boq & material take-off means extracting accurate steel tonnage, plate, bolt and paint-area quantities directly from the 3D model. The work is governed by AISC 360 and EN 1993, executed on licensed Tekla Structures and checked against a documented QA checklist before issue.
The standards that govern boq & material take-off
BOQ & Material Take-off is governed by AISC 360, EN 1993, IS 800, AWS D1.1. Which one leads depends on the project location and the owner's specification — a US refinery package and a European commercial building may need the same discipline executed to entirely different rules.
Beyond the headline code, most projects layer client specifications on top: operator standards (Shell DEPs, Saudi Aramco SAES, ADNOC), fabricator preferences and local authority requirements. A good boq & material take-off partner maps all of them into a compliance matrix at kick-off.
How code compliance is demonstrated
Compliance is shown through documentation, not assertion. Your package should include:
- Design basis / basis-of-design note referencing the governing code and edition.
- Calculation reports with load combinations and acceptance criteria.
- Drawings flagged with the applicable code and material grades.
- A documented checker's review with sign-off.
- Revision-controlled transmittals so the latest code-compliant issue is unambiguous.
Common compliance mistakes
The most frequent compliance failures we see in boq & material take-off are edition drift (working to a superseded code edition), mixing code systems mid-package, and missing project-specific overlays. Each is avoidable with a kick-off compliance matrix and a senior review gate.
Working across multiple jurisdictions
Global projects often need one package that satisfies several jurisdictions. We deliver boq & material take-off to AISC 360 and EN 1993 routinely and maintain checklists for each, so multi-code packages are reviewed against every governing standard, not just the primary one.

BOQ & Material Take-off Codes & Standards Explained: FAQ
Which code applies to boq & material take-off?
In short, boq & material take-off means extracting accurate steel tonnage, plate, bolt and paint-area quantities directly from the 3D model. The work is governed by AISC 360 and EN 1993, executed on licensed Tekla Structures and checked against a documented QA checklist before issue.
Which software is used for boq & material take-off?
We deliver on licensed Tekla Structures, AutoCAD, Navisworks and issue native files plus PDF, DWG and IFC on request.
Which standards do you follow for boq & material take-off?
We work to AISC 360, EN 1993, IS 800, AWS D1.1, plus client specifications such as Shell DEPs and major operator standards.
How long does a boq & material take-off package take?
Small packages are typically delivered in 3–7 working days; larger scopes are split into phased submissions agreed at kick-off.
How do I get a quote for boq & material take-off?
Send your drawings or scope through our quote form — a senior engineer reviews them and returns a fixed-price proposal within 24 hours, free and without obligation.
