
Asia Pacific
Structural Engineering Services in Manila
Every engineering discipline your Manila project needs — designed to AS 4100, AS/NZS 1170, AISC 360 and delivered with strong morning overlap with same-day review cycles.
Quick answer
Structural Engineering Services serves clients in Manila, Philippines with 60+ engineering services, working to AS 4100, AS/NZS 1170, AISC 360, ASME B31.3, SS EN 1993. Key sectors: Mining, LNG, Marine & Offshore, Commercial.
Design basis
Codes, standards & units for Manila
Drawings that arrive in the wrong convention cost days on the shop floor. Here is exactly what we design and draft to for Manila.
| Standard | Discipline | How we apply it |
|---|---|---|
| AS 4100 | Structural steel | Limit-state steel member and connection design |
| AS/NZS 1170 | Loads | Permanent, imposed, wind, snow and earthquake actions |
| AISC 360 | Structural steel | Member, connection and stability design for frames, racks and platforms |
| ASME B31.3 | Process piping | Wall thickness, flexibility and CAESAR II stress acceptance |
| SS EN 1993 | Structural steel | Singapore National Annex adoption of Eurocode 3 |
Units on Manila jobs
metric
Metric throughout — millimetres on drawings, metres for levels and setting out, kilonewtons and megapascals in the calculations.
What lands in your folder
Native Tekla, STAAD.Pro, CAESAR II and PV-Elite files plus PDF, DWG, DXF, NC1/DSTV and IFC.
Drawing conventions your fabricator expects
- Sheets & scales
- ISO A1 / A3 sheets, 1:100 GAs and 1:10 details
- Dimensions
- Millimetres, with reduced levels (RL) in metres
- Steel grades
- AS/NZS 3678 and 3679 Gr.250 / 300 / 350, or ASTM equivalents
- Bolting
- AS/NZS 1252 8.8/S and 8.8/TF categories called up on every connection
- Welding
- AS/NZS 1554 weld symbols with SP / GP category stated
- Projection
- Third-angle projection with site grid and survey datum
How we work with you
A working day with your Manila team
Nothing about this is improvised. Manila is 2 h 30 m ahead of our engineering desk (UTC+05:30), so we run a fixed daily rhythm around your working hours in Manila.
Clock positions use standard time for Manila; daylight saving shifts the band by one hour for part of the year.
5 h 30 m
Shared hours 12:00–17:30, Manila time
Same working day
Raised and closed inside one working day
Twice weekly
A 30-minute model walkthrough on screen, plus a written progress log
09:00
1. Overnight drop is waiting
Models, drawings and calculation updates produced while Manila was closed are already in the shared folder when your day starts.
12:00–17:30
2. Live window
Screen-share model walkthroughs, connection decisions and RFI closeout — with the engineer who did the work, not an account manager.
17:30
3. You hand off
Mark up the drawings, raise RFIs and set the next priority before you log off. The queue is picked up at the start of our next shift.
Next 09:00
4. Revisions back
Comments closed, revision clouds in place and the next issue in your folder before the first Manila meeting of the day.
Sector focus
Industries & project types in Manila
Most Manila enquiries come from these four sectors — and from the fabricators and EPCs serving them.
Heavy, abrasive-duty structures built far from anywhere — so the drawings have to be right first time.
- Conveyor galleries and trestles
- Transfer towers and chutes
- Silos, bins and hoppers
- Crusher and mill building steel
Cryogenic service, heavy modularisation and the documentation trail an LNG EPC expects.
- Cryogenic stress and support design
- Modularised process racks
- Tank appurtenances and access steel
- Jetty and loading-arm structures
Floating and fixed marine assets where weight control and corrosion allowance are part of the design brief.
- FPSO module steelwork
- Jetty, dolphin and mooring structures
- Marine-grade skid packages
- Transport and lift analysis
Building steelwork where architectural coordination and erection sequence matter as much as the member sizes.
- Office and retail steel frames
- Atrium and façade support steel
- Connection design and bolt lists
- Federated BIM model reviews
Commercial & compliance
Contracting, IP and invoicing for Manila, Philippines
Engineering is the easy part of an offshore engagement — the contract, the IP and the invoice are what stall it. Here is how we set those up for Manila, Philippines clients.
Fixed-price package
Quote in 24 h · 2–4 milestonesBest for: A defined scope — one building, one skid, one vessel
Lump sum against an agreed drawing and tonnage list. Milestone invoicing, and change orders only for scope you approve in writing.
Rate-based delivery
Weekly reporting · monthly invoiceBest for: Scope that is still moving
Per-drawing, per-tonne or per-hour rates fixed up front, with a weekly burn and progress report so the invoice never surprises you.
Dedicated engineers (ODC)
Monthly per seat · 1-month noticeBest for: A continuous workload across many projects
Named engineers reserved for you each month, working in your folder structure, templates and drawing standards under your team lead.
The paperwork, up front
Working with SES from Philippines
- Invoicing currency
- PHP or USD, fixed at contract stage
- Payment terms
- Milestone or monthly invoicing, net 30 days from invoice
- Contract vehicle
- NDA, then a master services agreement with a priced scope schedule per package
- IP & ownership
- Models, drawings, calculations and native files transfer to you on final payment
- Cross-border paperwork
- Tax-residency and invoice documentation supplied for Philippines finance and treaty relief
- Insurance
- Professional indemnity cover; certificate issued with the proposal on request
Local practice: Documentation is built for AS/NZS fabrication practice and for principal-contractor ITP, hold-point and witness-point regimes.
Confidentiality, IP & data security
- Mutual NDA signed before drawings are exchanged — usually inside one working day.
- All models, drawings, calculations and native files become your property on final payment.
- Project data lives in access-controlled folders; only the named team on your job can open them.
- No sub-contracting of your scope to a third party without your written consent.
- Every deliverable is produced on genuine licensed software, so your submission chain stays clean.
- Transfers over your portal, SharePoint, or our encrypted link — whichever your IT policy allows.
Coverage
Manila and the markets around it
Manila is one of several Philippines markets we support — the same engineers, the same drawing standards, wherever the fabricator sits.
- Work is delivered remotely from our engineering office: strong morning overlap with same-day review cycles.
- No travel premium, no minimum project size, and the same senior review on every package.
Manila within Philippines
Manila work is delivered from the same team that covers Philippines.
Across Asia Pacific
Regional peers on the same code basis and delivery model.
Directory
Every service we deliver in Manila
Open a discipline to see the exact scope you need. Each page sets out deliverables, the codes we work to in Manila and a typical turnaround.
62 services
Steel Structures & Detailing in Manila
20
Tekla-based 3D modeling and fabrication-ready steel detailing for every structure type.
- Steel Detailing Services in Manila
- Structural Steel Detailing in Manila
- Tekla 3D Modeling in Manila
- Fabrication & Shop Drawings in Manila
- Steel Erection Drawings in Manila
- BOQ & Material Take-off in Manila
- Pre-Engineered Building (PEB) Design in Manila
- Industrial Building Design in Manila
- Commercial Building Steel Design in Manila
- Pipe Rack Design in Manila
- Equipment Support Structures in Manila
- Offshore Platform Structures in Manila
- Transmission Tower Design in Manila
- Communication Tower Design in Manila
- Steel Staircase & Handrail Design in Manila
- Factory Shed Design in Manila
- Storage Tank Dome Roof Design in Manila
- Long-Span Roof Structures in Manila
- Process Plant Structures in Manila
- Loading Ramps & Industrial Platforms in Manila
Structural Analysis & Design in Manila
8
Code-compliant analysis, member design, connection and foundation design.
Piping Design & Stress in Manila
10
3D piping, layouts, isometrics and CAESAR II stress analysis for process plants.
- Piping Design Services in Manila
- Pipe Stress Analysis in Manila
- CAESAR II Stress Analysis in Manila
- CADWorx 3D Piping Modeling in Manila
- Piping Isometric Drawings in Manila
- Piping Layout & Routing in Manila
- Pipe Support Design in Manila
- Piping Thickness Calculation in Manila
- Valve Datasheets & Piping BOM in Manila
- Piping Spool Fabrication Drawings in Manila
Static Equipment Design in Manila
10
Mechanical design of pressure vessels, heat exchangers, tanks and stacks.
- Pressure Vessel Design in Manila
- PV-Elite Vessel Design in Manila
- ASME Section VIII Design in Manila
- Heat Exchanger Mechanical Design in Manila
- Storage Tank Design (API 650) in Manila
- Silo, Bin & Hopper Design in Manila
- Chimney & Stack Design in Manila
- Reactor & Jacketed Vessel Design in Manila
- Separator & Scrubber Design in Manila
- Static Equipment Design in Manila
Skid Package Engineering in Manila
4
Complete design of modular skids — vessel, piping, structure and lifting.
Finite Element Analysis in Manila
5
Advanced simulation on ANSYS Mechanical Enterprise for critical components.
CAD, BIM & Drafting in Manila
5
Detail engineering, BIM modeling and model reviews across all disciplines.
Also serving Asia Pacific
- Australia
- Perth
- Sydney
- New Zealand
- Singapore
- Malaysia
- Indonesia
- Melbourne
- Brisbane
- Adelaide
- Darwin
- Gold Coast
- Canberra
- Auckland
- Wellington
- Christchurch
- Kuala Lumpur
- Johor Bahru
- Penang
- Kuching
- Jakarta
- Surabaya
- Batam
- Thailand
- Bangkok
- Rayong
- Vietnam
- Ho Chi Minh City
- Hanoi
- Philippines
- Japan
- Tokyo
- Yokohama
- South Korea
- Seoul
- Busan
- Taiwan
- Hong Kong
- Sri Lanka
- Colombo
- Papua New Guinea
Start your project
Send your drawings. Get a quote in 24 hours.
Free, no-obligation proposal from a senior engineer.